Workshop 1 and 2 of Jiangsu Jinhao Food Technology Co., Ltd.
The building area is 12000m2, and the light-weight portal steel structure is adopted. In the construction process, a systematic and perfect time limit guarantee system is established, the initiative of construction management is mastered, the construction production situation is systematically controlled, and the foundation and key to ensure the construction progress.